Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 40 results ...

Abou-Zeid, A M K (1993) Data flow identification to support project automation/integration and productivity, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Al Sabah, R (2014) Evaluating the impact of construction risks on project success in the Arabian Gulf region (AGR) construction industry from the perspective of multinational firms, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Al-Fares, M A (1995) On the development of an integrated system for the automation of on-site reinforced concrete construction, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Ammar, A I (2001) Profitability of electrical contractors using financial and economical data: The effect of company's size, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Boodai, F J (2014) Achieving construction project success through integration in the project delivery system from an owner's perspective, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Chang, C-K (2004) Quantifying the impact of schedule compression on construction labor productivity, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Chen, J-H (2003) Litigation prediction model for construction disputes caused by change orders, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Chen, Y (2008) A highway work zone design and traffic management decision system, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Chin, C-S (2008) An investigation to improve construction information flows, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Choi, J (2003) Strategic motives underlying M and A transactions in the United States public construction industry, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Choi, K (2008) Applications of its archived data for improved highway planning and design, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

  • Type: Thesis
  • Keywords: highway; traffic; Korea; simulation
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/304448745
  • Abstract:
    With the advent of fully grown intelligent transportation systems (ITS) and ongoing ubiquitous transportation systems (UTS), a data rich environment for transportation analysis has been matured. Using ITS or UTS archived data, in this thesis, two major applications were made with a hope to improve the practice of transportation planning, design and possibly operation. First, using archived volume and travel time data acquired from an urban transportation network, the estimation of origin-destination (OD) matrices for a relatively short time period (5 min) has been performed using a path-based dynamic traffic simulation model. The dynamic or temporal OD, as a result, has been successfully used for dynamic traffic assignment and traffic signal control, showing different measures of effectiveness in terms of vehicle hours traveled and total delay, respectively. The second application deals with the issue of the estimation of design hourly volume or the peak hour volume factor, so called K-factor, which influences the size of roadway facilities in the phase of planning and design. A new method overcoming the problems of the current K-factor has been devised using the statistical method with full one year archived data reserved in the Korean expressway archived data repository, called OASIS. Both results based on old and new K-factors have been compared, using the case of the expressway 50 of Korea, to observe the differences between the two approaches. The results were quite different in design hourly volumes and the required number of lanes. The method is rather quantitative compared with the traditional K30 approach and is supposed to be successfully used in other regions or countries. Examples in this thesis show only two applications for transportation planning and design. Numerous and better applications could be also possible in the area of traffic operations. The methods introduced in this research shed light on the prospective applications and can be integrated into the currently existing ADMS systems both in US and in Korea. For the better application, the issue of data sharing between agencies and other technical issues should also be addressed in the future.

Daegu, C (2009) Construction information database framework (CIDF) for integrated cost, schedule, and performance control, Unpublished PhD Thesis, , University of Wisconsin - Madison.

De Cicco, S (2004) Design and development of an information management system for highway construction specifications, Unpublished PhD Thesis, , University of Wisconsin - Madison.

El Asmar, M (2012) Modeling and benchmarking performance for the integrated project delivery (IPD) system, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Gunduz, M (2002) Change orders impact assessment for labor intensive construction, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Huang, C-N (2003) Time study on two-echelon supply chain for steel framing construction: Field investigation and networking model simulation, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Ibrahim, M W W (2018) Improving project performance by mitigating out-of-sequence work and assessing construction readiness, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Iskandar, K A S (2018) A new comprehensive mathematical assessment methodology for team collaboration and integration and project performance in healthcare construction, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Jang, H (2002) Construction material logistics: Project manager level of satisfaction and facilities layout planning, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Kang, M M K (2014) Development of an expert system for sustainable pavement preservation strategies (es2p2s), Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Kim, S-K (2001) Toward a framework for an intelligent earthwork system (ies), Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Koo, K-J (2000) Organizational program management for multiple maintenance projects under multi-trade capacity constraints, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Lee, J C (2010) Evaluating the sustainability of construction with recycled materials, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Lee, S (2000) Spatial model and decentralized path planning for construction automation, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Lee, T S (1990) Detection of collusion in highway construction contract bidding, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Lukito, P K (2000) A framework for environmental monitoring infrastructure investment planning in developing areas, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Menches, C L (2006) Effect of pre-construction planning on electrical project performance, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Nassereddine, H M (2019) Design, development and validation of an augmented reality-enabled production strategy process for the construction industry, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Onaran, B E (1996) The construction of professional identity in architecture and landscape architecture: Convictions about skills, knowledge, and professional roles in design, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Paap, K (1999) Masculinity under construction: Gender, class, and race in the construction industry, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Park, H-K (2001) Cash flow forecasting model using moving weights of cost categories for general contractor on jobsite, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Rungjang, K (2013) Public investment for developing port facilities within competitive market, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Schmitt, R L (1998) Development of statistically based methods to determine QC/QA testing levels for hot-mix asphalt construction, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Schwab, A (2000) Management practices in short-term network organizations: The performance impact of the shadow of the future and psychological contracts in the United States movie industry, 1931--1940, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Shr, J-F (1999) Model development for cost-plus-time bidding applied to Florida department of transportation highway construction, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Sullivan, K T (2004) Quantification of the cumulative impact of change orders on sheet metal labor productivity, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Swider, S C (2008) Behind great walls: Modes of employment among migrant construction workers in China's informal labor market, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Taha, M A-E (1994) Applying distributed artificial intelligence to the prequalification of construction contractors, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Yi, J S (2003) CAMP (CAse Matching Prediction): A dynamic forecasting model for periodic expenditures of residential building projects, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Yoo, Y J (2014) The development of green building performance assessment tool (GBPAT), Unpublished PhD Thesis, , University of Wisconsin - Madison.